Brown Water Below the New Road
1Every spring, the Alder River Watershed Club at Fairmont Middle School helps with a cleanup along the river and the streams that drain into it. This year, club members Beatriz Castillo and Jonah Whitfield noticed a new problem. A construction crew had cleared 4 hectares of land beside Cobble Creek, a stream that flows into the Alder River, to build a road and a parking area. After heavy rains, the creek below the site turned brown.
2During a rainstorm, water running over bare soil can pick up loose bits of soil, called sediment, and carry them into streams. Cloudy water blocks some of the sunlight that underwater plants need. Sediment can also clog the gills of fish and stream insects and bury the gravel where some fish lay their eggs. Scientists measure how cloudy water is with a turbidity meter, in units called NTU. The higher the number, the cloudier the water. The town set a goal of keeping Cobble Creek below 50 NTU after storms.
3With help from a town water specialist, the club set up a way to monitor the creek. Within two hours after each storm that dropped at least 2 cm of rain, members used the same meter to test water from two bridges: Site U, upstream of the construction site, and Site D, downstream of it.
4The town also tested ways to keep sediment out of the creek. After the first two storms, the crew put up a silt fence, a low wall of tough fabric staked along the bottom edge of the site. Water can seep through the fabric, but much of the soil it carries is trapped behind it. Before the fifth storm, the crew also covered the bare soil with straw and sowed grass seed in it. The silt fence cost $1,400, and the straw and grass seed cost $1,100.