Lift Lines and Snowfall: Sample Estimates
0 / 14Lift Lines and Snowfall: Sample Estimates
Use random samples to estimate population values and compare how estimates vary.
1. Estimate Lift-Line Waits
Use the random sample to make estimates. Treat each recorded lift-line wait as one observation.
| Wait (minutes) | Number of records |
|---|---|
| 2 | 4 |
| 4 | 8 |
| 6 | 14 |
| 8 | 10 |
| 10 | 4 |
What percent of the sampled waits lasted at least 8 minutes? %
Use the sample to estimate how many of Saturday's 1,200 waits lasted at least 8 minutes. waits
Find the mean wait in the sample. minutes
2. Compare Lift-Line Estimates
Each sample below was selected separately at random from the same 1,200 Saturday records. Records may appear in more than one sample.
| Sample | Records sampled | Waits of 8+ minutes |
|---|---|---|
| Pine | 40 | 12 |
| Summit | 40 | 18 |
| Ridge | 40 | 14 |
| Basin | 40 | 16 |
Estimate the number of waits lasting at least 8 minutes among all 1,200 records using each named sample. Pine: waits; Summit: waits
Use all four samples to make four population-count estimates. What is the difference between the highest and lowest estimates? waits
Using that average percentage, how many of the 1,200 waits are estimated to last at least 8 minutes? waits
3. Compare Snowfall Samples
Use the historical records described below. A sample-based estimate is not an exact count or a forecast.
| Sample | Days sampled | Days with 10+ cm |
|---|---|---|
| One | 12 | 3 |
| Two | 12 | 5 |
| Three | 12 | 4 |
| Four | 12 | 6 |
Using Sample One, estimate how many of last season's 120 days had at least 10 cm of snowfall. days
Calculate the percent of days with at least 10 cm of snowfall in each sample. What is the difference between the highest and lowest percentages? percentage points
| Sample | Days sampled | Days with 10+ cm |
|---|---|---|
| North | 24 | 8 |
| South | 24 | 9 |
| East | 24 | 10 |
| West | 24 | 9 |