Bus to Subway: Simulate the Connection
0 / 14Bus to Subway: Simulate the Connection
Model delays, run trials, and use the results to plan trips.
Design the Model
A trip uses one city bus followed by one subway train. The bus is late on 30% of trips, and the subway is late on 20% of trips. Assume the two delays are independent. Random digits 0–9 are equally likely.
How many random digits are needed? digits
Run and Record
Run the simulation using the supplied random digits. Treat each row as one complete trip, even when a digit repeats.
| Trial | Bus digit | Subway digit |
|---|---|---|
| 1 | 0 | 1 |
| 2 | 7 | 0 |
| 3 | 2 | 8 |
| 4 | 6 | 4 |
| 5 | 1 | 0 |
| 6 | 9 | 7 |
| 7 | 4 | 1 |
| 8 | 2 | 1 |
| 9 | 0 | 6 |
| 10 | 8 | 3 |
Write the estimated probability as a decimal.
Estimated probability: %
What is the combined estimated probability that both vehicles are late? Write a decimal.
Use and Improve the Simulation
Use the stated simulation results for each question. Estimates describe patterns, not guaranteed outcomes.
| Outcome | Number of trips |
|---|---|
| Neither late | 108 |
| Only bus late | 42 |
| Only subway late | 34 |
| Both late | 16 |
Estimated percentage needing a buffer: %
Predicted number: trips